Polychlorinated Biphenyls (PCBs) Controls

Power Transformer

Photo credit: Sturmovik

Regulations

The Municipal Regional Stormwater Permit (MRP) Provision C.12 requires municipalities to implement specified control measures to reduce PCBs and achieve local and regionwide reduction goals. The control program for PCBs includes source control, treatment control, and pollution prevention strategies to reduce PCB loads to meet Total Maximum Daily Loads (TMDLs). Permittees may comply with requirements of this provision through a collaborative effort.

Provision C.12 PCB Controls of the MRP

Demolition of building by equipmentGreen Stormwater Infrastructure Gutter DrainageTraining